Vert
19-02-2007, 12:59 PM
Taken from another website:
N-GmbH have resurfaced Flugplatz, Schwedenkreuz, Hohe Acht and Wippermann (think it was needed there!) :eek:
All the kerbs are being changed on the down hill section of Fuchsröhre and on the Karrussel.
The inside of the second kerb at Wippermann has been built up with concrete making it noticeably higher. This could give the car quite a bang if you run over it too far.
N-GmbH have resurfaced Flugplatz, Schwedenkreuz, Hohe Acht and Wippermann (think it was needed there!) :eek:
All the kerbs are being changed on the down hill section of Fuchsröhre and on the Karrussel.
The inside of the second kerb at Wippermann has been built up with concrete making it noticeably higher. This could give the car quite a bang if you run over it too far.